Introduction to Power Generation and Distribution Systems on Commercial Vessels
By
Elstan A Fernandez, Senior
Lecturer,
Department of Electrical
Engineering
Tolani Maritime Institute
Induri, Pune
Email: elstan_a_fernandez@yahoo.com
![]()
This paper is based on the following:
a)
References from about 30 books – mostly international
editions and numerous papers;
b)
Information from Original Equipment Manufacturers (OEMs),
research scholars / technologists and Classification Societies across the world.
c)
My own hands-on experience in the field and also in teaching
the subject for several years.
1 Importance of SOLAS Requirements
1.1 The basic difference
between warships and commercial vessels
At the outset, with reference to the
points in discussion, I wish to mention that the operation of foreign-going
vessels that are greater that 500 grt are governed by SOLAS Regulations,
requirements by Classification Societies and of course the International
Maritime Organisation; warships however are exempted as they supersede
these requirements. In this regard, the following extracts from the SOLAS
Consolidated Edition 2004 are relevant:
Chapter 1 – Part A –
Regulation 3 – Exceptions (Paragraph
(a) serial (i);
Regulation 4 – Exemptions; and
Regulation 5
– Equivalents
In the commercial shipping industry,
the flag states i.e. the governments of which are the contracting governments
or otherwise termed as the Administration, govern the compliance (of such
vessels) to the International Convention for the Safety of Life at Sea and the
directives of the Secretary General of the International Maritime Organisation.
1.2
Specific requirements for passenger ships and cargo ships
As an example, a few extracts from SOLAS and ABS Rules are
mentioned:
Chapter II – 1 – Part C –
Machinery Installations – Regulation 26 – General Paragraph 6; and
Chapter II – 1 – Part D – Electrical Installations –
Regulation 42 – Emergency source of electrical power in passenger ships
Paragraph 6 are similar to an extract from American Bureau of Shipping Rules
for Building and Classing Steel Vessels –
2005 (Part 4 - Vessel Systems and
Machinery; Chapter 1 – General; Section 1 - Classification of Machinery)
Quote
TABLE 7
Design Angles of Inclination
|
|
Angle of inclination, degrees(1) |
|||
|
Athwartship |
Fore-and-aft |
|||
|
Installations, components |
Static |
Dynamic |
Static |
Dynamic |
|
Propulsion
and auxiliary machinery |
15 |
22.5 |
5(4) |
7.5 |
|
Safety equipment |
|
|
|
|
|
Emergency
power installation(3) |
22.5 |
22.5 |
10 |
10 |
|
Emergency
fire pumps and their drives |
22.5 |
22.5 |
10 |
10 |
|
Switchgear |
|
|
|
|
|
Electrical
and electronic appliances and control systems |
22.5(2) |
22.5(2) |
10 |
10 |
Notes
1 Athwartship and fore-and-aft inclinations
occur simultaneously.
2
Up to an angle of inclination of 45
degrees, switches and controls are to remain in their last set position.
3 In vessels designed for
carriage of liquefied gases and of chemicals, the emergency power installation
is to remain operable with the vessel flooded to its permissible athwartship
inclination up to a maximum of 30 degrees.
4 (2004) Where the
length of the vessel exceeds 100 m (328 ft), the fore-and-aft static angle of
inclination may be taken as 500/L degrees, where L is the length
of the vessel in meters (1640/L degrees, where L is the length of
the vessel in feet), as defined in 3-1-1/3.1.
Unquote
Similarly, SOLAS Chapter II-1-Part D – Electrical Installations – Regulations 40 to 45 are relevant to installation
and operational aspects.
2
Power generation and distribution considerations on
commercial ships
In this paper, my aim is to highlight
the generic options available in the commercial shipping industry. No
comparison is made to any defence related installations both afloat or ashore.
Any similar viable off-the-shelf options explained here, if non-existent in the
Indian Navy may be adopted if so desired.
2.1 Power Supplies Commonly Available
a)
Impressed current (or sacrificial anode) protective system
for outer hull protection or for installations within the main machinery space.
b)
Limited and locally earthed systems, such as starting and
ignition systems of internal combustion engines.
Large passenger ships have three or four large generators rated at 2MW or
more to supply the extensive hotel services on board.
A cargo ship may have two main generators typically rated from
350 to 1000kW, which are sufficient to supply the engine room auxiliaries while
at sea, and the winches or cranes for handling cargo while in port.
The limited load required during an emergency demands that the emergency
generators be rated from about 10kW for a small coaster to about 300kW or more
for a cargo vessel. The shipbuilder must estimate the number and power rating
of the required generators by assessing the power demand of the load for all
situations whether at sea or in a port. Electrical power onboard a ship is
commonly generated at 440V, 60Hz (sometimes 380V, 50Hz). These values have been
adopted because they are standard shore supplies in the
Ships with a very large electrical power demand may be designed to
operate at 3.3kV and even 6.6kV or higher. Lighting and other domestic supplies
usually operate at 110, 115V or 220V a.c. (single-phase). Transformers are used
to reduce the generated voltage to this safer voltage level. Where portable
equipment is to be used in dangerous, hot and damp locations, it is advisable
to operate at 55V or even 25V, supplied again by a step-down transformer.
Occasionally, transformers are also used to step up voltages, e.g. supplying a
large 3.3kV bow thruster motor from a 440V switchboard supply. Batteries for
various services operate at 12V or 24V but sometimes, higher voltages are used.
2.2
Maximum
Voltages
The Institution of Electrical
Engineers’ Regulations for Electrical and Electronic Equipment of ships (1990)
and the 1994 Supplement recommend for alternating current installations as
follows:
+
500 Volts for generators, power, galley, and heating equipment
permanently connected to fixed wiring;
+
254 Volts (440/Ö3 = 254, where 440 is the generated line voltage in a three-phase system and
254 is the phase voltage or single-phase supply derived from it)
for lighting, heaters in cabins, public rooms and other applications;
+
15000 Volts (but 3.3kV or 6.6kV are often used) in very large a.c.
installations; the generation and limited distribution being subjected to
special considerations.
2.3 Specific
Systems for Ship’s Service
The following systems are
recognised as standard types for a.c. generation:
a)
3-phase 3-wire insulated
b)
3-phase 3-wire with the neutral
earthed
c)
3-phase 4-wire with the neutral
earthed
The following systems are
recognised as standard types for primary a.c. distribution:
a) 3-phase 3-wire insulated
b) 3-phase 3-wire with neutral earthed
c) 3-phase 4-wire with neutral earthed
d) Single-phase 2-wire insulated
The following systems are
recognised as standard types for secondary a.c. distribution:
a) 3-phase 3-wire insulated
b) 3-phase
3-wire with neutral earthed
c) 3-phase
4-wire with neutral earthed
d)
Single-phase 2-wire insulated
e)
Single-phase 2-wire with one pole
earthed
f)
Single-phase 2-wire with the
mid-point of the system earthed
The following frequencies are
recognised as standard types:
a) 50
Hz is a European standard frequency.
b) 60 Hz is
the most common frequency adopted for use onboard ships, the higher frequency
thus enabling motors and generators to run at higher speeds with a consequent
reduction in size for a given power rating.
The standard values for specific
requirements are mentioned in Table 1 below:
Sl.
No. |
Applications |
Recognised
Standard Voltages |
|
|
1 |
Power, heating and cooking equipment
securely fixed and permanently connected |
Three-phase |
380 |
|
415 |
|||
|
440 |
|||
|
Single-phase |
115 |
||
|
220 |
|||
|
240 |
|||
|
2 |
Fixed Lighting |
Single-phase |
115 |
|
220 |
|||
|
240 |
|||
|
3 |
Socket outlets
for use where extra precautions against electric shocks are necessary a) Where
a safety-isolating transformer supplying only one socket outlet is used |
Single-phase |
55 |
|
115 |
|||
|
220 |
|||
|
240 |
|||
|
b) Supplied without the restrictions in (a)
above. |
Single-phase |
24 |
|
|
48 |
|||
|
55 |
|||
|
Single-phase |
115 with mid-point earthed |
||
|
4 |
Supply to equipment for general purposes,
connected by flexible cable, other than for applications in 3 and 5 |
Single-phase |
115 |
|
220 |
|||
|
240 |
|||
|
5 |
Socket outlets
rated at 15 amperes or more and intended for equipment, the connection to
which incorporates an earth-continuity conductor ³ 1.5mm2 in cross-sectional area |
Three-phase |
415 440 |
|
6 |
Internal communications |
Single-phase |
12 |
|
24 |
|||
|
115 |
|||
|
220 |
|||
|
240 |
|||
Table 1 –
Voltages for AC Systems on Ships
It is often convenient to group motor driven auxiliaries
according to their function, e.g. fuel and lubrication oil services,
accommodation ventilation systems, machinery ventilation systems and domestic
service systems.
The auxiliary motors would be supplied from grouped motor
controllers located either in the engine room, in a machinery control room or
in a convenient location close to the auxiliary motors. This can often simplify
the machinery control functions and required protection systems’ circuitry.
On small ships, e.g. tugs, etc., such grouping is not
economical and the major ship’s auxiliaries are normally supplied directly from
the main switchboard. In this case the motors would be provided with individual
starters located adjacent to the motor. For high-speed vessels where weight is
important, minimum cable weight may be achieved using a ‘non-distributed’
distribution scheme. Auxiliary motor controls should be arranged in compliance
with the general control philosophy applied to machinery control systems.
For ship’s that do not have automated machinery operation,
the most economic method of control is to provide local starters for each
auxiliary motor supplied from power panels located in the same or adjacent spaces.
These motors would be manually controlled (started and stopped), locally at the
motor’s controller (e.g., a starter). This arrangement minimises cable costs.
When a centralised machinery control system is required,
cables for the motor control functions can be installed back to the machinery
control room and the starter push buttons located on a centralised machinery
control console. Alternatively, the motors may be grouped together at motor
control centres located inside the control room. The motor control functions
can then be left on the motor’s starter at the MCC or again wired back to a
central control desk.
When hard-wired systems are used, the installation is prone
to mechanical problems, which may cause loose or broken connections; and the marine
environment can also cause corroded connections. These problems have been
overcome to a certain extent by using microprocessors and digital control
systems. When fully automatic machinery control is required, these techniques
are now in common use and microprocessor devices control the ship’s machinery
through video display units (or desktop computers) located in the machinery
control room or on the bridge.
The ship’s auxiliaries are generally controlled with
programmable logic controllers (PLCs) installed inside the motor control
centres and linked through a data bus to the machinery control location. When
this type of system is used, the motor control centres can be located either
together in the machinery control room or alternatively, distributed throughout
the ship close to the motors being controlled. There is little difference in
the cabling requirements of either method, however when motor control centres
are located outside a dry, atmosphere-controlled space such as the machinery
control room, a higher degree of mechanical protection is required (IP 44
instead of IP 22) and consequently adds to the MCC costs
2.5 Emergency Services
To ensure that electrical supplies are available to emergency
and safety systems, in the event of a main power failure, an emergency
generator and associated emergency switchboard will be located above the main
deck in a separate space, completely isolated from the main machinery spaces.
Emergency services would be supplied from the emergency switchboard using distributed
panels for navigation, safety and emergency lighting services. These
distribution panels are also generally arranged to be above the bulkhead
deck.
Where lighting systems are concerned, it is important to ensure that a
fire or flooding in one area will not cause the loss of lighting supply in
other areas or along escape routes and the circuitry must be designed in
compliance with the ships general arrangements.
2.6 Emergency Stop Panel
According
to the requirements of the classification societies, additional emergency stop
circuits have to be installed for certain consumers at a location that is
separate from their installation position, e.g., in order to switch off fans,
the fuel or oil pumps in the endangered area if there is a fire
Auxiliary services on board a ship
range from engine room pumps and fans, deck winches and windlasses to general
lighting, catering and air-conditioning. Electrical power is used to drive a
majority of these auxiliary services. The electrical power system on board a
ship is designed to provide a secure supply to all loads with adequate built-in
protection for the equipment and operating personnel as well. The general
scheme of a ship’s electrical power system is common to nearly all ships.
2.8 Load Analysis
Extract from Abs Rules for Building and Classing
Steel Vessels - 2005
Part 4 Vessel Systems and Machinery;
Chapter 8 Electrical Systems; Section 1 General Provisions
Quote
5.1.5 Load Analysis (2002)4-8-1/5.1.5
An electric-plant (including high voltage ship service transformers or
converters, where applicable per 4-8-2/3.7) load analysis is to cover all
operating conditions of the vessel, such as conditions in normal sea-going,
cargo handling, harbor maneuver, and emergency operations.
Unquote
The power rating of the generators is determined by the power demand of
the electrical load. Principle design documents for the ship’s auxiliary
services should include a load list, load analysis and short-circuit current
analysis. In consultation with the client, all electrical services on the
vessel are identified. Approximate horsepower or kilowatt ratings are obtained
for motors. Lighting loads are estimated from the ship’s general arrangements
and electronic aids are obtained from similar vessels, and then a complete load
list compiled. The electrical load analysis uses the load list in order to
estimate the expected power demand of the electrical system under specific
operating conditions of the ship. Typical operating conditions would be with
the ship, ‘in transit’, ‘at anchor’, ‘manoeuvring’, etc. For special vessels,
other operating conditions would be appropriate such as ‘towing’ for a tug,
‘drilling’ for a drill ship.
Load analysis helps to calculate the expected power demand by multiplying
each service power by a ‘demand’ factor. The demand factor is a combined load
factor and diversity factor and is the ratio of the estimated power consumption
of a service to its normal full load power consumption. It is determined by an
experienced assessment of the estimated power during a four to six hour period
when loads may be at their maximum utilisation.
For each service, data banks are searched to determine the service
full-load current and power factor dependent upon the operating voltage. The
information thus derived, is used to determine the services’ kilowatt and
kilovar demand from which the kilovolt-amps required is finally computed.
Also, by applying the demand factor to each load (kW and kVAr) and
summing all loads for specific operating conditions, the expected kilowatts,
kilovolt-amps and power factor can be computed. By comparing the expected load
for the different operating conditions of the ship, the number and rating of
the main generators can be assessed.
Preliminary short-circuit current
calculations can be completed once the load analysis and number and rating of
generators have been determined. The principle purpose of short-circuit current
calculation is to ascertain the short-circuit rating of the systems’ protective
devices. Several types of short-circuit current calculations are applied under
different circumstances at various stages of the design process. The major
contributors to short-circuit current are the generators and motors.
The most simple short-circuit current
analysis is based on an assumed value of the generator’s sub-transient
reactance and an approximate estimate of the worst case motor loading can be
obtained from the load analysis.
The ‘second stage’ short-circuit current analysis is
completed when the electrical system’s conceptual one-line diagram is finished.
For this calculation actual sub-transient data is used together with cable
transformers and other system parameters. This calculation generally results in
lower values of short-circuit current.
When complete system information is
available, a ‘third-stage’ short-circuit analysis is completed. This is the
most accurate and also determines the decrements of the short-circuit current
over a 3 and 5 cycle period.
2.9 Power
Management Systems
A vessel may have a number of
generating sets, a split bus bar and a variable load. Since UMS classification,
automatic control has become common to ensure continuity of service and an
efficient management of both generating and load equipment. Power management
systems (PMS) have in the past been relay based, but a programmable electronic
system (PES) using a programmable logic controller (PLC) is now more commonly
used. This can also be integrated into a distributed control system (DCS) for
supplying information to the bridge.
A typical power management system
will incorporate the following functions:
2.9.1 Load Demand
Monitoring
The total load is monitored and
compared with available on-line generating capacity.
2.9.2 Generator
Management
In response to varying load, the
system will start up a standby generator and initiate the synchronising
sequence to bring it on-line, or off-load a generator, disconnect it from the
bus and stop it when no longer required.
2.9.3 Load Sharing
The load demand is shared between
generating sets which are on-line. This can be done on a proportional basis
according to the rated power of each set.
2.9.4 Frequency
Control
The frequency of the bus is monitored
and kept within a specified limit by means of raise / lower signals to each
generator governor.
2.9.5 Load Inhibit
Some systems operate a load inhibit
to prevent a sudden increase in load when generating capacity is not available.
Load shedding, to trip selected loads
in a preset sequence if generating capacity is not sufficient, is often
undertaken by a system separate from the PMS automatic control. It can be taken
care of by a preferential tripping device.
Each of the earlier mentioned PMS
functions will be defined within the system software. The necessary inputs are
provided as on/off status inputs from circuit breakers and generator status
signals, analog inputs of generator power and current, power of each load and
voltage and frequency of each bus section. Outputs are given to raise / lower
generator governor settings, close circuit breakers or initiate an auto
synchronising system.
An operator interface will provide
selection of duty and standby generating sets, and the ability to set levels at
which generating sets are introduced or shut down. The operator will be provided
with information such as power generated, power demands, running and standby
capacity. An interface to the ship’s main alarm system is likely, giving system
alarms and indications of any faults within the PMS itself. The main advantage
of using a programmable electronic system / PLC for a PMS is the mathematical
functions that it can perform. For example, if the power input from the
generator fails, generator power can be calculated using the current input and
an assumed or actual power factor. Overloads can also be calculated and hence
the load reduced by a minimum amount, or an increase in load calculated in
advance and the required generating capacity brought on.
3 Examples of systems on Modern Commercial Vessels
a) Power Plants and Power Management

A Basic Power Generation and
Distribution System (on a modern merchant ship)
Note: It
may be noted that higher voltages are used for the simple fact that overall
weight of equipment may be reduced thereby permitting increased cargo-carrying
capacity. Some motors like thrusters may
operate at voltages as high as 6.6kV also.

The Power Plant Concept
(Courtesy - ABB

(Courtesy - ABB
b) Various Types
of Modern Electrical Propulsion Systems

Schematic Diagram of a
Cycloconverter-based Propulsion System

(Courtesy ABB

(Courtesy Schottel GmbH and Co.
KG)
Contra-rotating
Props
The above methods of propulsion
with a single skeg arrangement can help to boost the overall thrust and even
eliminate the need for a dedicated steering system. The other systems used are
azipods,
The various
types of power generation, distribution and propulsion systems, including some
of the latest systems are designed by renowned manufacturers like Siemens AG (
c) Addendum:
If so desired, any the following topics related to merchant
ships can be discussed to some extent:
1)
Electrical Safety
2)
Distribution Systems
3)
Emergency Power and Shore Supply
4)
Insulated and Earthed Neutral Systems
5)
Alternators & Shaft Generators
6)
Automatic Voltage Regulators
7)
Switchboards and Switchgear
8)
Starters for Miscellaneous
Equipment
9)
Fault Protection Devices
10)
Insulation and Ingress Protection
11)
Transformers
12)
Propulsion Systems
13)
Steering and Stabiliser
Systems
14)
Control of Air Compressors
15)
Lighting Systems
16)
Alarm Indication Systems (fire alarms, crankcase oil mist
detectors and basic scanners)
17)
Gas Analysers (O2, CO2 and Combustible
Gas Indicators)
18)
Some Miscellaneous Systems
Some of my credentials:
Ø
Certified Trainer (for Maritime Training) as per Government
of India, Ministry of Shipping requirements
Ø
Founder faculty member at TMI – totally about 13 years’
teaching experience alone.
Ø
First resident Certified Foreign Expert at the
Ø
Author of a widely-used 1,000-page text book titled Marine
Electrical Technology (2nd Edition published in August 2004) that was
reviewed by the Chief Surveyor with the Govt. of India and Chief Examiner of
Engineers, Directorate General of Shipping.
Ø
Presently co-authoring a book on Marine Control Engineering
among other activities.
Acknowledgment
I am especially grateful to the following distinguished persons, who
have been very kind to personally grant me the requisite permission to publish
their relevant information for academic purposes
Colin Wright,
Senior Technical Officer,
International Association of Classification Societies,
IACS Permanent Secretariat,
(www.iacs.org.uk)
for the permission to use any of the material / subject
published and also for the good suggestion of involving our students in the
IACS Work Programme tasks lists as a
stimulation to discussion
Stewart Wade
Vice President
American Bureau of Shipping
(www.eagle.org)
for the permission to print
the required extracts from ABS Rules for
Building and Classing Steel Vessels
Annette Nymann
ABB AS
Global Sales and Marketing,
BU Marine, Automation Technologies Division
Hasleveien 50,
Arnfinn Ingjerd
Communication Manager
Rolls-Royce Commercial Marine
(www.rolls-royce.com)
for his guidance, review and
permission on the article “Controllable Pitch Main Propellers”
Kurt A Scholz
Manager
Public Relations
Schottel
GmbH and Co. KG
D –
56322 Spay Rhein
for the permission to publish information on
Schottel products
Brian
Beattie
(www.marineengineering.org.uk)
for the permission to freely use the information
from over 175 topics on his website and his interest in contributions for the
improvement of the same, wherein students from all over the world would benefit
from this effort
My Publisher - Shroff Publishers and
Distributors (Sterling Book House)
for the permission to use extracts from the SOLAS
Consolidated Edition – 2004.